Plumbing subagreements might live in SharePoint while drawings and specifications sit in Procore. Executed change orders are scattered between both. Project managers manually cross-reference these project files to confirm that rough-in scope, fixture installation, gas piping, and site utility demarcation lines are assigned trade by trade.
Miss one gap and costs compound quickly. A single unassigned scope item between the plumber and the mechanical contractor, like condensate piping or a gas pressure regulator, becomes a change order that can materially erode project profitability. Inconsistent review creates commercial risk.