Prime contracts and change orders sit in SharePoint. Drawings and specs sit in Procore. By the time a completed scope of work template reaches a VP of Operations for sign-off, validation becomes a manual reconciliation workflow across disconnected project files with no standard enforcement.
That downstream risk is concrete. Scope gaps hide between trades. Overlaps stay unresolved until coordination breaks down. Executed changes go unincorporated. The average U.S. construction dispute now costs $60.1 million, and errors and omissions in contract documents, along with failure to understand or comply with contractual obligations, ranked as the #1 cause of North American disputes for two consecutive years.