IFT drawings sit in one folder. IFC revisions sit in another. Addenda sit across email threads. When a new civil drawing set drops, someone still runs manual Bluebeam overlays to review grading plans, utility layouts, and flatwork details sheet by sheet.
That review consumes staff time and creates downstream risk. Design changes, errors, omissions, rework, and low-quality project files drive cost deviation, field conflict, RFIs, and disputes when scope shifts between IFT and IFC go undetected.




